The middle ground between a per-square-foot rule and a full bill of quantities. You list the elements the building actually has โ€” this many columns of that size, this slab, that wall โ€” and it sums the concrete, steel, bricks and mortar across all of them. Unlike thumb rules it reflects your building; unlike a BOQ it needs no rates.

What people do next

Features

  • Six element types โ€” footing, column, beam, slab, wall and plaster.
  • Steel taken at the rate appropriate to each member, not one blanket figure.
  • Concrete broken into cement, sand and aggregate at your chosen grade.
  • Masonry and plaster mortar proportioned and added in.
  • Per-element working shown as you type.
  • Runs entirely in your browser โ€” nothing is uploaded.

How to use the Material Takeoff Calculator

  1. 1Add an element group for each part of the structure.
  2. 2Enter its dimensions in metres and how many there are.
  3. 3Set the concrete grade and wastage.
  4. 4Read the totalled materials for the whole structure.

Frequently asked questions

What is a material takeoff?

Measuring quantities directly off the drawings, element by element, rather than estimating them from a rate per square foot. It is what a quantity surveyor produces before a bill of quantities can be priced, and it is far more accurate than a thumb rule because it reflects the building you are actually building.

Why does steel differ by element?

Because reinforcement is sized by what the member does. A footing spreads load and needs relatively little โ€” 50 to 80 kg per cubic metre. A column carries load in compression with heavy ties and can reach 250. A slab sits around 70 to 110 and a beam 100 to 200. Applying one blanket rate across a structure is how a steel order ends up materially wrong in either direction.

How many bricks are in a cubic metre of wall?

About 500. A standard Indian brick with a 10 mm mortar joint occupies roughly 0.002 mยณ including its share of the joint, so a cubic metre takes around 500 of them and about 0.25 mยณ of mortar. The brick calculator does this more precisely for a given wall and brick size.

How is this different from the material estimator?

The estimator applies per-square-foot thumb rules to a whole building โ€” fast, and only as good as the average. This measures your actual elements, so a building with unusual spans, thick slabs or many columns comes out right where a thumb rule would not. Use the estimator to budget and this to order.

Can I use this to order steel?

As a quantity, yes โ€” but not as a cutting list. The steel here is a volume-based allowance by member. For actual bar lengths, shapes, hooks and laps you need a bar bending schedule, which is what goes to the bar bender.